Velleman VMB8PB User Manual Page 13

  • Download
  • Add to my manuals
  • Print
  • Page
    / 16
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 12
VMB8PBU – ed.1 | 8-channel pushbutton module 13
Point in time
The time (day and hour) at which the program step is carried out.
Day setting:
o A certain day of the week (Monday, Tuesday... Sunday)
o All working days (Monday through Friday)
o Every weekend (Saturday and Sunday)
o All days except Sunday
o All days of the week
o On date: a certain date (1...31) of a certain month (January ... December)
o Every month on a certain day (1...31) of every month
Hour setting:
o At a certain hour (hour and minutes)
o At wake-up time 1 (plus or minus a number of quarters)
o At wake-up time 2 (plus or minus a number of quarters)
o At bed-time 1 (plus or minus a number of quarters)
o At bed-time 2 (plus or minus a number of quarters)
o At sunrise (plus or minus a number of quarters)
o At sunset (plus or minus a number of quarters)
Action
Following actions can be realized:
Simulate a push on a pushbutton
Simulate a long push on a pushbutton
Simulate releasing a pushbutton
Simulate pulse-control for which time-out can be set between:
o 0.25 sec
o 1 sec and 2 min, in steps of 1 sec
o 2 min and 5 min, in steps of 15 sec
o 5 min and 30 min, in steps of 30 sec
o 30 min and 1 hour, in steps of 1 min
o 1 hour and 5 hours, in steps of 15 min
o 5 hours and 10 hours, in steps of 30 min
o 10 hours and 18 hours, in steps of 1 hour
Locking or unlocking a pushbutton
Activating/deactivating the switching program:
For each pushbutton the switching program can be activated or deactivated. This can be done via the VelbusLink
program or via pushbuttons that are connected to the Velbus.
Following functions can be realized:
The switching program of a pushbutton is not executed as long as another Velbus pushbutton is closed.
The switching program of a pushbutton is not executed as long as another Velbus pushbutton is open.
The switching program of a pushbutton is not executed during a certain time-out period by a push on another
Velbus pushbutton. Choose to reactivate or deactivate the switching program next time the other pushbutton is
operated again.
The deactivation time can be permanent or set between:
o 1 sec and 2 min, in steps of 1 sec
o 2 min and 5 min, in steps of 15 sec
o 5 min and 30 min, in steps of 30 sec
o 30 min and 1 hour, in steps of 1 min
o 1 hour and 5 hours, in steps of 15 min
o 5 hours and 10 hours, in steps of 30 min
o 10 hours and 24 hours, in steps of 1 hour
o 2 or 3 days
Activate the switching program for a pushbutton through a push on another Velbus pushbuttons.
Selection switching program:
There are 3 different program groups to choose from: summer, winter or holiday program. This can be done via the
VelbusLink software or via other pushbuttons that are connected to the Velbus system.Only the program steps that
belong to the program group are executed. If no program group is selected, no program steps will be executed.
Page view 12
1 2 ... 8 9 10 11 12 13 14 15 16

Comments to this Manuals

No comments